David D. Hunting YMCA
Grand Rapids, Michigan
Summary
- Phase: complete
Description
Applied intumescent coatings in main pool area and installed wood veneer wallcoverings over the main reception desk.
Working for Bouma Corporation we applied 50 gallons Nu-Chem Thermo-sorb on the structural steel in requested rooms.
Contributors On This Project
-
Eckhoff & DeVries Painting
Painting and Intumescent Coating
- Visser Brothers, Inc. General Contractor - Design/Build and Steel Erection, Carpentry
-
Architectural Glass & Metals, Inc.
Glazing and Metal Panels, Metal Siding and Aluminum Sun Shades
-
Driesenga & Associates
Material Testing
- Van Dam Iron Works, Inc. Misc. Metal Fab.
- Steel Supply & Engineering Misc. Metal Fab. and Structural Steel Fabrication
-
Ritsema Associates
Flooring
- Welch Tile & Marble Flooring and tile in pool and deck
-
Materials Testing Consultants, Inc.
Geotechnical and Construction Materials Testing and Engineering
-
Kent Companies, Inc.
Concrete Contractor
-
Kerkstra
Supplier and Precast Concrete
-
JDH Engineering
Structural Engineering